Construction of a new canal along the old canal line with new locks and bridges. Work started in late September 1999 and was completed in March 2001.
- Client: Tameside Environmental Services in partnership with British Waterways
- Client (Delta section): Quarmby Construction Co. Ltd.
- Design and Supervision: Tameside Environmental Services
- Contractor: Dew Construction Ltd.
Page 1: Lock 7w, Mottram Road and Tesco
This page: Armentieres Square and Lock 6w
Page 3: Melbourne Street, Lock 5w, Lock 4w and Caroline Street